Miss. P. & L. Co. v. Miss. Ex Rel. Moore, 487 U.S. 354 (1988)

Contents:
Author: John Paul Stevens

Show Summary

Miss. P. & L. Co. v. Miss. Ex Rel. Moore, 487 U.S. 354 (1988)

JUSTICE STEVENS delivered the opinion of the Court.

On July 1, 1985, Grand Gulf Unit 1, a major nuclear powerplant located in Port Gibson, Mississippi, began commercial operations. An order entered by the Federal Energy Regulatory Commission (FERC) required Mississippi Power and Light Company (MP&L) to purchase 33% of the plant’s output at rates determined by FERC to be just and reasonable. The Mississippi Public Service Commission (MPSC) subsequently granted MP&L an increase in its retail rates to enable it to recover the cost of its purchases of Grand Gulf power. On appeal, the Mississippi Supreme Court held that it was error to grant an increase in retail rates without first examining the prudence of the management decisions that led to the construction and completion of Grand Gulf 1. The question presented to us is whether the FERC proceedings have preempted such a prudence inquiry by the State Commission. For reasons similar to those set forth in Nantahala <CS:PageBrk>[487 U.S. 357

] Power & Light Co. v. Thornburg, 476 U.S. 953 (1986), we conclude that the state proceedings are preempted, and therefore reverse.

I

MP&L is one of four operating companies whose voting stock is wholly owned by Middle South Utilities (MSU), a public utility holding company.{1} The four companies are engaged both in the wholesale sale of electricity to each other and to companies outside the MSU system and in the retail sale of electricity in separate service areas in Louisiana, Arkansas, Missouri, and Mississippi. Through MSU the four companies operate as an integrated power pool, with all energy in the entire system being distributed by a single dispatch center located in Pine Bluff, Arkansas. Wholesale transactions among the four operating companies historically have been governed by a succession of three "System Agreements," which were filed with FERC in 1951, 1973, and 1982. The System Agreements have provided the basis for planning and operating the companies’ generating units on a single-system basis, and for equalizing cost imbalances among the four companies.

The retail sales of each of the operating companies are regulated by one or more local regulatory agencies. For example, Arkansas Power and Light Company (AP&L) sells in both Arkansas and Missouri, and therefore is regulated by both the Arkansas Public Service Commission and the MPSC. MP&L’s retail rates are subject to the jurisdiction of the MPSC.

Through the 1950’s and into the 1960’s, most of the MSU system’s generating plants were fueled with oil or gas. In the late 1960’s, the MSU system sought to meet projected increases in demand and to diversify its fuel base by adding coal and nuclear generating units. It was originally contemplated that each of the four operating companies would finance and construct a nuclear power facility.{2} Consistent with this scheme, MP&L was assigned to construct two nuclear power facilities at Port Gibson, Mississippi, Grand Gulf 1 and 2.{3} The Grand Gulf project, however, proved too large for one operating company to finance. MSU therefore formed a new subsidiary, Middle South Energy, Inc. (MSE), to finance, own, and operate Grand Gulf. MSE acquired full title to Grand Gulf, but hired MP&L to design, construct, and operate the facilities.

In April, 1974, MSE and MP&L applied to MPSC for a certificate of public convenience and necessity authorizing the construction of the plant. The State Commission granted the certificate, noting that MP&L was part of "an integrated electric system," and that

the Grand Gulf Project [would] serve as a major source of baseload capacity for the company and the entire Middle South System pooling arrangement.{4}

App. to Motion to Dismiss 36-37.

By the late 1970’s, it became apparent that system-wide demand in the ensuing years would be lower than had been forecast, making Grand Gulf’s capacity unnecessary. Moreover, regulatory delays, additional construction requirements, and severe inflation frustrated the project Management decided to halt construction of Grand Gulf 2, but to complete Grand Gulf 1, largely on the assumption that the relatively low cost of nuclear fuel would make the overall cost of Grand Gulf power per kilowatt hour lower than that of alternative energy sources. As it turned out, however, the cost of completing Grand Gulf construction was about six times greater than had been projected.{5} Consequently, the wholesale cost of Grand Gulf’s power greatly exceeds that of power produced in other system facilities.

The four operating companies considered various methods of allocating the cost of Grand Gulf’s power. In 1982, MSU filed two agreements with FERC. The first was a new System Agreement, which set forth the terms and conditions for coordinated operations and wholesale transactions among the four companies, including a scheme of "capacity equalization payments," which were designed to ensure that each company contribute proportionately to the total costs of generating power on the system. Transactions related to the purchase of power from Grand Gulf 1, however, were not included in the 1982 System Agreement. The second agreement filed with FERC was the Unit Power Sales Agreement (UPSA), which provided wholesale rates for MSE’s sale of Grand Gulf 1 capacity and energy. Under the UPSA, AP&L was not obligated to purchase any of Grand Gulf’s capacity; LP&L was obligated to purchase 38.57%, NOPSI 29.8%, and MP&L 31.63%.

The FERC Proceedings

FERC assigned the agreements to two different Administrative Law Judges, who were charged with the task of determining whether the agreements were "just and reasonable" within the meaning of the Federal Power Act.{6} Extensive hearings were held by each ALJ, in which numerous parties representing consumer interests and the various state regulatory agencies participated. Both judges concluded that, because Grand Gulf was designed to serve the needs of the entire MSU system, the failure to distribute the costs associated with Grand Gulf among all members of the system rendered the agreements unduly discriminatory, and that costs should be allocated in proportion to each company’s relative system demand.{7} Middle South Services, Inc., 30 FERC ¶ 63,030, pp. 65, 170-65, 173 (1985) (1982 System Agreement); Middle South Energy, Inc., 26 FERC ¶ 63,044, pp. 65, 105-65, 108 (1984) (UPSA).

FERC consolidated the decisions of the Administrative Law Judges for review and issued its decision in June, 1985. Middle South Energy, Inc., 31 FERC ¶ 61,305. The Commission acknowledged that it had before it difficult cost allocation issues, and that there were "no easy answers." After extensive review, FERC concluded that the most equitable result would be to adopt ALJ Liebman’s formula for allocating Grand Gulf costs.

The Commission affirmed and adopted the findings of the Administrative Law Judges that MSU is a highly integrated and coordinated power pool. It concluded that the result of this integration and coordination was "planning, construction, and operations which [were] conducted primarily for the system as a whole." Id. at 61,645. Because it found that nuclear units on the System had been "planned to meet overall System needs and objectives," it concluded

that some form of equalization of nuclear plant costs [was] necessary to achieve just, reasonable, and nondiscriminatory rates among the MSU operating companies.

Id. at 61,655. The Commission agreed with the judges that the 1982 System Agreement and the UPSA as filed would not together produce proper cost allocation, but concluded that the 1982 System Agreement, in conjunction with ALJ Liebman’s allocation of capacity costs associated with Grand Gulf, would "achieve just and reasonable results." Ibid. Thus, FERC affirmed the allocation of 33% of Grand Gulf’s capacity costs to MP&L as just and reasonable. Although it did not expressly discuss the "prudence" of constructing Grand Gulf and bringing it on line, FERC implicitly accepted the uncontroverted testimony of the MSU executives who explained why they believed the decisions to construct and to complete Grand Gulf 1 were sound, and approved the finding that

continuing construction of Grand Gulf Unit No. 1 was prudent, because Middle South’s executives believed Grand Gulf would enable the Middle South system to diversify its base load fuel mix and, it was projected, at the same time, produce power for a total cost (capacity and energy) which would be less than existing alternatives on the system.

26 FERC, at 65, 112-65, 113; see 31 FERC, at 61,666 (affirming ALJ Liebman’s decision to the extent not modified).

The Commission later clarified certain aspects of its previous order in the course of considering several petitions for rehearing. It rejected contentions that its exercise of jurisdiction would destroy effective state regulation of retail rates. Specifically, FERC rejected claims that it could not exercise jurisdiction because such action would result in States’ being "precluded from judging the prudence of Grand Gulf costs, and denied any say in the rate of return imposed as part of these costs," and "imping[e] on the State’s paramount authority in certification decisions regarding need, type, and costs of construction of new generating facilities." 32 FERC ¶ 61,425, p. 61,951 (1985). FERC asserted that its opinion was "the result of a careful balancing of the state and Federal interests involved," and that it had paid "careful heed to the impact [its] decision would have on the states." Id. at 61,951-61,952. FERC went on to reject the argument that allocation of Grand Gulf costs should be based on whether individual companies needed Grand Gulf capacity. Since Grand Gulf had been constructed to meet the needs and serve the goals of the entire system, FERC reasoned that

the allocation of Grand Gulf power must rest not on the "needs" of an individual company, but rather on the principles of just, reasonable, nondiscriminatory, and nonpreferential rates.

Id. at 61,958. FERC emphasized that the parties had entered the pooling agreement voluntarily, and that its decision did no more than

alter, in as limited a means as possible, the agreed-upon cost scheme in order to achieve just, reasonable, nondiscriminatory and non-preferential rates.

Id. at 61,961.

On review, the United States Court of Appeals for the District of Columbia Circuit affirmed FERC’s order that the four operating companies share the cost of the system’s investment in nuclear energy in proportion to their relative demand for energy generated by the system as a whole. The court first rejected various challenges to FERC’s authority to restructure the parties’ agreed-upon allocations, holding that the Federal Power Act (FPA) gave FERC the necessary authority. The court then affirmed FERC’s allocation of Grand Gulf capacity and costs as both rational and within the Commission’s range of discretion to remedy unduly discriminatory rates. Mississippi Industries v. FERC, 257 U.S.App.D.C. 244, 285, 808 F.2d 1525, 1566 (1987).{8}

The State Proceedings

On November 16, 1984, before the FERC proceedings were completed, MP&L filed an application for a substantial increase in its retail rates. The major portion of the requested increase was based on the assumption that MP&L would be required to purchase 31.63% of the high-cost Grand Gulf power when the unit began operating on July 1, 1985, in accordance with the terms of the UPSA. After public hearings, on June 14, 1985, the Mississippi Commission entered an order allowing MP&L certain additional revenues, but denying MP&L any retail rate relief associated with Grand Gulf Unit 1. App. to Juris. Statement 33a.

On June 27, 1985, MP&L applied for rehearing of the order insofar as it denied any rate relief associated with Grand Gulf. As expected, Grand Gulf went on line on July 1, 1985, and MP&L became obligated consistent with FERC’s allocation to make net payments of about $27 million per month for Grand Gulf capacity. After public hearings on the rehearing petition, the MPSC found that MP&L would become insolvent if relief were not granted, and allowed a rate increase to go into effect to recover a projected annual revenue deficiency of about $327 million. The increase was predicated entirely on the company’s need for revenues to cover the purchased power expenses associated with Grand Gulf 1. See id. at 39a.

In its order the MPSC noted that petitions for rehearing were pending before FERC, in which the MPSC was continuing to challenge the allocation of 33% of Grand Gulf’s power to MP&L. Id. at 28a. It stated that it intended "to vigorously pursue every available legal remedy challenging the validity and fairness of the FERC allocation to MP&L," id. at 51a, and that appropriate rate adjustments would be made if that allocation was changed. The order made no reference to the prudence of the investment in Grand Gulf.

The Attorney General of Mississippi and certain other parties representing Mississippi consumers appealed to the Mississippi Supreme Court. Under Mississippi law, the MPSC has authority to establish just and reasonable rates which will lead to a fair rate of return for the utility. Miss.Code Ann. § 77-3-39 (Supp.1987). "A fair return is one which, under prudent and economical management, is just and reasonable to both the public and the utility." Southern Bell Tel. & Tel. Co. v. Mississippi Public Service Comm’n, 237 Miss. 157, 241, 113 So.2d 622, 656 (1959); Mississippi Public Service Comm’n v. Mississippi Power Co., 429 So.2d 883 (Miss.1983). The appealing parties charged, inter alia, that the MPSC had exceeded the scope of its authority by adopting "retail rates to pay Grand Gulf expenses without first determining that the expenses were prudently incurred." Mississippi ex rel. Pittman v. Mississippi Public Service Comm’n, 506 So.2d 978, 979 (Miss.1987). The State Supreme Court agreed, rejecting the argument that requiring the MPSC to review the prudence of incurring costs associated with Grand Gulf would violate the Supremacy Clause of the United States Constitution. The court concluded that MP&L and its sister and parent companies were using the jurisdictional relationship between state and federal regulatory agencies to completely evade a prudency review of Grand Gulf costs by either state or federal agencies, and remanded the case to the MPSC for further proceedings. The court held that FERC’s determination that MP&L’s assumption of a 33% share of the costs associated with Grand Gulf would be fair to its sister operating companies did not obligate the State to approve a pass-through of those costs to state consumers without a prudence review.{9}

The court rejected MP&L’s argument that the decision of this Court in Nantahala Power & Light Co. v. Thornburg, 476 U.S. 953 (1986), which barred the State of North Carolina from setting retail rates that did not take into account FERC’s allocation of power between two related utility companies, foreclosed a state prudence review. Nantahala, the state court concluded, simply did not force the

MPSC to set rates based on the construction and operation of a plant (nuclear or otherwise) that generates power that is not needed at a price that is not prudent.

506 So.2d at 985. The court assumed that only the fact that Grand Gulf was owned by an out-of-state corporation, as opposed to MP&L, created a question whether a state prudence determination was preempted, and concluded that that fact was not enough to rob it of authority. The court distinguished Nantahala because that case concerned an agreement allocating low-cost power, and the prudence of purchasing the available low-cost hydroelectric power was never at issue.

The state court adopted the view that, in determining whether a particular aspect of state regulation was preempted by FERC action, the state court should "`examine those matters actually determined, whether expressly or impliedly, by the FERC.’" 506 So.2d at 986 (quoting Appeal of Sinclair Machine Products, Inc., 126 N. H. 822, 833, 498 A.2d 696, 704 (1985)). It concluded that ,

"[a]s to those matters not resolved by the FERC, State regulation is not preempted provided that regulation would not contradict or undermine FERC determinations and federal interests, or impose inconsistent obligations on the utility companies involved."

506 So.2d at 986. The court then noted that FERC "was never presented with the question of whether the completion of Grand Gulf, or its continued operation, was prudent" id. at 986, and that the Court of Appeals, in affirming FERC’s allocation, had "made no finding with regard to prudency, because the issue was not presented." Id. at 987 (emphasis in original). Consistent with this analysis, the Mississippi Supreme Court remanded the case to the MPSC "for a review of the prudency of the Grand Gulf investment." The court specified that this review should

determine whether MP&L, [MSE] and MSU acted reasonably when they constructed Grand Gulf 1, in light of the change in demand for electric power in this state and the sudden escalation of costs.

Ibid. Thus, the MPSC was directed to examine the prudence of the investment of both domestic and foreign corporations in Grand Gulf "in light of local conditions." Ibid. (emphasis in original).

Appellant MP&L contends that our decision in Nantahala, the FPA, and the Commerce Clause require the MPSC, in setting retail electric rates, to recognize that expenses incurred under FERC wholesale rate decisions that allocate interstate wholesale costs are reasonably incurred operating expenses.{10} In essence appellant asserts that FERC’s allocation of Grand Gulf power preempts the jurisdiction of state regulatory agencies to set retail rates that do not recognize the costs associated with that allocation as reasonable. Appellees contend that the Supremacy Clause does not preclude review of MP&L’s managerial prudence, and that the effect of preemption would be to create a regulatory gap not contemplated by Congress, the Constitution, or this Court.

II

We hold that our decision in Nantahala rests on a foundation that is broad enough to support the order entered by FERC in this case, and to require the MPSC to treat MP&L’s FERC-mandated payments for Grand Gulf costs as reasonably incurred operating expenses for the purpose of setting MP&L’s retail rates. The Mississippi Supreme Court’s judgment ordering the MPSC to conduct proceedings to determine whether some or all of the costs were not prudently incurred is preempted by federal law, and must be reversed.{11} In Nantahala, we considered the preemptive effect of a FERC order that reallocated the respective shares of two affiliated companies’ entitlement to low-cost power. Under an agreement between the two affiliated companies, Nantahala, a public utility selling to both retail and wholesale customers in North Carolina, had been allocated 20% of the low-cost power purchased from the Tennessee Valley Authority, while 80% was reserved for the affiliate whose only customer was their common parent. FERC found that the agreement was unfair to Nantahala, and ordered it to file a new wholesale rate schedule based on an entitlement to 22.5% of the low-cost power purchased from TVA. Subsequently, in a retail rate proceeding, the North Carolina Regulatory Commission reexamined the issue and determined that any share less than 24.5% was unfair, and therefore ordered Nantahala to calculate its costs for retail ratemaking purposes as though it had received 24.5% of the low-cost power. The effect of the State Commission’s order was to force Nantahala to calculate its retail rates as though FERC had allocated it a greater share of the low-cost power and to deny Nantahala the right to recover a portion of the costs it had incurred in paying rates that FERC had determined to be just and reasonable. Although the North Carolina Supreme Court acknowledged FERC’s exclusive jurisdiction over wholesale rates, it held that the State Commission’s de facto reallocation of low-cost power was

"well within the field of exclusive state ratemaking authority engendered by the `bright line’ between state and federal regulatory jurisdiction under the Federal Power Act."

Nantahala, 476 U.S. at 961 (quoting State ex rel. Utilities Comm’n v. Nantahala Power & Light Co., 313 N.C. 614, 687-688, 332 S.E.2d 397, 440-441 (1985)). The state court emphasized that its order did not require Nantahala to violate the FERC order, and that it was not expressly contradicting a FERC finding. We rejected these arguments. The reasoning that led to our decision in Nantahala applies with equal force here, and compels the same conclusion -- States may not alter FERC-ordered allocations of power by substituting their own determinations of what would be just and fair. FERC-mandated allocations of power are binding on the States, and States must treat those allocations as fair and reasonable when determining retail rates.

Our decision in Nantahala relied on fundamental principles concerning the preemptive impact of federal jurisdiction over wholesale rates on state regulation. First, FERC has exclusive authority to determine the reasonableness of wholesale rates. It is now settled that

"the right to a reasonable rate is the right to the rate which the Commission files or fixes, and, . . . except for review of the Commission’s orders, [a] court can assume no right to a different one on the ground that, in its opinion, it is the only or the more reasonable one."

Nantahala, 476 U.S. at 963-964 (quoting Montana-Dakota Utilities Co. v. Northwestern Public Service Co., 341 U.S. 246, 251-252 (1951)). This principle binds both state and federal courts, and is in the former respect mandated by the Supremacy Clause. 476 U.S. at 963. Second, FERC’s exclusive jurisdiction applies not only to rates, but also to power allocations that affect wholesale rates. Id. at 966. Third, States may not bar regulated utilities from passing through to retail consumers FERC-mandated wholesale rates.

The filed rate doctrine ensures that sellers of wholesale power governed by FERC can recover the costs incurred by their payment of just and reasonable FERC-set rates. When FERC sets a rate between a seller of power and a wholesaler-as-buyer, a State may not exercise its undoubted jurisdiction over retail sales to prevent the wholesaler-as-seller from recovering the costs of paying the FERC-approved rate. . . . Such a "trapping" of costs is prohibited.

Id. at 970. These principles led us to hold in Nantahala that the North Carolina Utilities Commission’s order "trapping" federally mandated costs was preempted. Today they compel us to hold that the MPSC may not enter an order "trapping" the costs MP&L is mandated to pay under the FERC order allocating Grand Gulf power, or undertake a "prudence" review for the purpose of deciding whether to enter such an order.{12}

The facts of this case and Nantahala are not distinguishable in any way that has relevance to the operation of the principles stated above. Both cases concern FERC orders adjusting in the interest of fairness voluntary allocations of power among related entities. Nantahala involved a FERC order fixing the utility’s right to acquire low-cost power; this case involves a FERC order fixing MP&L’s obligation to acquire high-cost power. In Nantahala, FERC had

determined that Nantahala’s average cost of power obtained from TVA should be based on a particular allocation of entitlements power, and no other,

id. at 971 (emphasis added); in this case FERC has determined that MP&L’s cost of power obtained from Grand Gulf should be based on a particular allocation, and no other. In Nantahala, the state court attempted to approve retail rates based on the assumption that Nantahala was entitled to more low-cost power than FERC had allocated to it. Here, the state court seeks to permit the State to set rates based on an assumption that MP&L is obligated to purchase less Grand Gulf power than FERC has ordered it to purchase.

In this case, as in Nantahala, we hold that

a state utility commission setting retail prices must allow, as reasonable operating expenses, costs incurred as a result of paying a FERC-determined wholesale price. . . . Once FERC sets such a rate, a State may not conclude, in setting retail rates, that the FERC-approved wholesale rates are unreasonable. A State must, rather, give effect to Congress’ desire to give FERC plenary authority over interstate wholesale rates, and to ensure that the States do not interfere with this authority.

Nantahala, 476 U.S. at 965, 966. Thus, we conclude that the Supremacy Clause compels the MPSC to permit MP&L to recover as a reasonable operating expense costs incurred as the result of paying a FERC-determined wholesale rate for a FERC-mandated allocation of power.

Appellees seek to characterize this case as falling within facts distinguished in Nantahala. Without purporting to determine the issue, we stated in Nantahala:

[W]e may assume that a particular quantity of power procured by a utility from a particular source could be deemed unreasonably excessive if lower-cost power is available elsewhere, even though the higher-cost power actually purchased is obtained at a FERC-approved, and therefore reasonable, price.

Id. at 972 (emphasis in original). As we assumed, it might well be unreasonable for a utility to purchase unnecessary quantities of high-cost power, even at FERC-approved rates, if it had the legal right to refuse to buy that power. But if the integrity of FERC regulation is to be preserved, it obviously cannot be unreasonable for MP&L to procure the particular quantity of high-priced Grand Gulf power that FERC has ordered it to pay for. Just as Nantahala had no legal right to obtain any more low-cost TVA power than the amount allocated by FERC, it is equally clear that MP&L may not pay for less Grand Gulf power than the amount allocated by FERC.

The Mississippi Supreme Court erred in adopting the view that the preemptive effect of FERC jurisdiction turned on whether a particular matter was actually determined in the FERC proceedings. See 506 So.2d at 986. We have long rejected this sort of "’case-by-case analysis of the impact of state regulation upon the national interest’" in power regulation cases. Nantahala, 476 U.S. at 966 (quoting FPC v. Southern California Edison Co., 376 U.S. 205, 215-216 (1964)). Congress has drawn a bright line between state and federal authority in the setting of wholesale rates and in the regulation of agreements that affect wholesale rates. States may not regulate in areas where FERC has properly exercised its jurisdiction to determine just and reasonable wholesale rates or to insure that agreements affecting wholesale rates are reasonable. FERC’s jurisdiction to adjust the allocations of Grand Gulf power in the UPSA has been established.{13} Mississippi, therefore, may not, consistent with the Supremacy Clause, conduct any proceedings that challenge the reasonableness of FERC’s allocation.

The reasonableness of rates and agreements regulated by FERC may not be collaterally attacked in state or federal courts. The only appropriate forum for such a challenge is before the Commission or a court reviewing the Commission’s order. The Mississippi Supreme Court attached considerable significance to the fact that the prudence of investing in Grand Gulf and bringing it on line was not discussed either in the proceedings before FERC or on review by the United States Court of Appeals for the District of Columbia Circuit. The question of prudence was not discussed, however, because no party raised the issue, not because it was a matter beyond the scope of FERC’s jurisdiction. The Mississippi Supreme Court characterized the conduct of MP&L and its sister companies as an effort to

us[e] the jurisdictional relationship between state and federal regulatory agencies to completely evade a prudency review of Grand Gulf costs by either agency.

506 So.2d at 979. The facts of this case, however, offer no evidence of such subterfuge. The very parties who are appellees here, and who urged the Mississippi Supreme Court to order the MPSC to conduct a prudence review, were also participants in the proceedings before FERC. The parties to the FERC proceedings recognized the impact that FERC’s order would have on the jurisdiction of the state regulatory agencies. See Middle South Energy, Inc., 32 FERC ¶ 61,425, pp. 61,951-61,952 (1985). Despite that recognition, appellees failed to raise the matter of the prudence of the investment in Grand Gulf before FERC, though it was a matter FERC easily could have considered in determining whether to permit MSE to recoup 100% of the costs of Grand Gulf in the wholesale rates it charged to the four operating companies, and in allocating Grand Gulf power. See New England Power Co., 31 FERC ¶ 61,047, pp. 61,081-61,084 (1985), enf’d, 800 F.2d 280 (CA1 1986).

In fact, FERC did consider and reject some aspects of the prudence review the Mississippi Supreme Court directed the MPSC to conduct. The state court emphasized that the MPSC was to determine whether "MSU and its subsidiaries made reasonable decisions in light of local conditions." 506 So.2d at 987. FERC rejected, however, the argument that decisions about the allocation of Grand Gulf costs should be made in light of the needs of any one of the operating companies. It emphasized that

the Middle South companies appropriately approach power planning on a system-wide basis, whereby the individual companies’ needs are the component parts of the System power plan, [and that] [i]mplementation of the System plan . . . require[d] that the individual companies’ needs be subsumed by the greater interests of the entire System.

32 FERC, at 61,958. Thus, FERC’s order specifically bars a state regulatory agency from evaluating the prudence of Grand Gulf "in light of local conditions" alone. The state court also directed a "complete review of the transactions between MP&L, [MSE], and MSU, and their effect on Grand Gulf expense." These transactions, however, comprise the very System Agreements between MSU and the operating companies and UPSA evaluated by FERC in the exercise of its jurisdiction over wholesale rates. The MPSC lacks jurisdiction to reevaluate the reasonableness of those transactions. The MPSC cannot evaluate either the prudence of MSU’s decision to invest in Grand Gulf and bring it on line or the prudence of MP&L’s decision to be a party to agreements to construct and operate Grand Gulf without traversing matters squarely within FERC’s jurisdiction.{14}

There "can be no divided authority over interstate commerce . . . the acts of Congress on that subject are supreme and exclusive." Missouri Pacific R. Co. v. Stroud, 267 U.S. 404, 408 (1925). Consequently, a state agency’s "efforts to regulate commerce must fall when they conflict with or interfere with federal authority over the same activity." Chicago and North Western Transp. Co. v. Kalo Brick & Tile Co., 450 U.S. 311, 318-319 (1981). Mississippi’s effort to invade the province of federal authority must be rejected. The judgment of the Mississippi Supreme Court is reversed.

It is so ordered.

1. The other operating companies owned by MSU are Louisiana Power and Light (LP&L), New Orleans Public Service, Inc. (NOPSI), and Arkansas Power and Light Company (AP&L).

2. Prior to the events that gave rise to the instant controversy, each generating unit on the system was owned, financed, constructed, and operated by a single operating company, despite the fact that new generating units were planned and constructed in accordance with the needs of the system as a whole, not merely the needs of the particular operating company. Middle South Energy, Inc., 31 FERC ¶ 61,305, p. 61,653 (1985).

3. Originally, AP&L was assigned to build and operate two nuclear facilities in Arkansas, ANO 1 and ANO 2; LP&L undertook the construction of Waterford 3 and 4; MP&L was assigned to build and operate Grand Gulf l; and NOPSI was to construct a unit near New Orleans. Although the two ANO units were completed without incident, regulatory delays, additional construction requirements, and severe inflation led to serious problems in the construction of the remaining units. Plans to construct Waterford 4 quickly failed, and severe costs overruns marred the completion of Waterford 3. The site for the NOPSI facility proved unsuitable, and responsibility for construction of that unit, Grand Gulf 2, was transferred to MP&L.

4. The MPSC’s Order Granting Certificate of Public Convenience and Necessity reflected the MPSC’s appreciation of the interstate dimensions of the MSU system. It stated, in part:

Middle South Utilities, Inc. ("Middle South") is a holding company registered under the Public Utility Holding Company Act of 1935. It owns all of the outstanding common stock of each of its principal operating subsidiaries: Arkansas Power & Light Company (Arkansas), Arkansas-Missouri Power Company (Ark-Mo), Louisiana Power & Light Company (Louisiana), [MP&L], and New Orleans Public Service Inc. (NOPSI). . . . Middle South and all of its subsidiaries constitute the Middle South Utilities System (Middle South System). The electric properties of the System operating companies constitute an integrated public utility system.

* * * *

The generating facilities of the Middle South System have been strategically located with a reference to the availability of fuel, protection of local loads and other controlling economic factors. The size of these units has been determined basically by the projected load growth of the Middle South System. [MP&L’s] present rate and capital structure obviously cannot support construction of this magnitude.

In order to finance this construction on a basis that will be in the best interests of both its investors and the investors in its subsidiaries, and to insure adequate and dependable electric service to the customers and service areas of its subsidiaries, including Company, and without unnecessarily complicating its financial structure, Middle South [Middle South Energy, Inc.] has been organized.

App. to Motion to Dismiss 27-28, 30-31.

5. It was originally estimated that the cost per kilowatt of capacity would be about $500; by the time commercial operations began, that cost amounted to $2,933. The original estimate for the cost of two nuclear units at Port Gibson was approximately $1.2 billion. Regulatory delays, additional construction requirements imposed after the Three Mile Island disaster, and severe inflation, however, ran up Grand Gulf costs to more than $3 billion for the single unit. See Mississippi Industries v. FERC, 257 U.S.App.D.C. 244, 250, 808 F.2d 1525, 1531 (1987).

6. Section 205 of the Federal Power Act declares unlawful any rate charged in any transaction within FERC’s jurisdiction that is not just and reasonable. 49 Stat. 851, as amended, 16 U.S.C. § 824d(a). Section 206 of the Act provides that, when FERC determines after a hearing that

any rate, charge, or classification, demanded, observed, charged, or collected by any public utility for any transmission or sale subject to the jurisdiction of the Commission, or that any rule, regulation, practice, or contract affecting such rate, charge, or classification is unjust, unreasonable, unduly discriminatory or preferential, the Commission shall determine the just and reasonable rate, charge, classification, rule, regulation, practice, or contract to be thereafter observed and in force, and shall fix the same by order.

16 U.S.C. § 824e(a). Because FERC determined that the UPSA allocating Grand Gulf power among the four operating companies was a contract affecting the wholesale rates of those operating companies, § 206 of the FPA imposed on FERC an obligation to fix terms that would render the contract "just and reasonable." See Mississippi Industries, 257 U.S.App.D.C. at 259-260, 808 F.2d at 1540-1541.

7. Administrative Law Judge Liebman, who reviewed the UPSA,

concluded that the evidence was overwhelming that the Middle South system is a single integrated and coordinated electric system operating in Louisiana, Mississippi, Arkansas, and Missouri. He found that the Grand Gulf project was initiated in the 1970’s to meet the then projected load demand of the system, and not just the load of any Middle South operating company or companies, and further, that every unit on the Middle South system had been constructed to meet system load. Therefore, he concluded that the costs of Grand Gulf capacity and energy should be shared equitably by all four operating companies and their customers,

and that the allocations in the UPSA were "unjust, unreasonable and unduly discriminatory." Middle South Energy, Inc., 31 FERC, at 61,632-61,633 (emphasis in original); Middle South Energy, Inc., 26 FERC ¶ 63,044, pp. 65, 106-65, 108 (1984). He concluded that the allocation proposal submitted by the Louisiana Public Service Commission was the most equitable. Under that proposal, each operating company would be allocated a share of the cost of nuclear capacity on the MSU system roughly in proportion to each company’s relative share of system demand, as fixed in 1982. 26 FERC, at 65,109. This approach allocated 33% of Grand Gulf’s capacity costs to MP&L, a percentage slightly higher than that contained in the UPSA, which had distributed costs among only three of the operating companies.

Administrative Law Judge Head, who presided in the proceedings involving the 1982 System Agreement, advocated equalizing production costs on the basis of annual demand. Although he characterized Grand Gulf as an "anomaly," he reached conclusions similar to ALJ Liebman’s about the relationship of Grand Gulf to the system:

[Grand Gulf] was planned, licensed, and constructed as a system plant, intended to supply power not only in Mississippi but throughout the entire MSU system. . . . [T]he financial responsibility and production cost responsibility for Grand Gulf should be borne by all the operating companies. . . .

* * * *

. . . Grand Gulf [should be integrated] into the 1982 System Agreement by having each of the four operating companies pay for the production costs of the Grand Gulf facility based on the ratio that the individual operating company’s total annual demand bears to the total annual system demand.

Middle South Services, Inc., 30 FERC ¶ 63,030, p. 65, 172 (1985) (emphasis added).

Both judges considered and rejected MP&L’s proposition that costs should be allocated in accordance with the 1973 System Agreement. Under the 1973 Agreement, the cost to be borne by each operating company would depend on the percentage of Grand Gulf capacity that company needed to meet the demands of its customers. Thus, companies owning capacity sufficient to meet their needs, "long" companies, would not bear any of the cost, while "short" companies, companies that have to purchase additional capacity to meet their needs, would bear the total cost. Responsibility would shift as particular operating companies became "shorter" or "longer." Since MP&L is predicted to be a long company until sometime in the 1990’s, under the 1973 System Agreement, it would not have had to bear any costs associated with Grand Gulf until depreciation had substantially reduced the cost of Grand Gulf power.

8. Judge Bork agreed with most of the majority’s decision, but dissented from the panel’s affirmance of FERC’s specific allocation of Grand Gulf costs on the ground that FERC had failed adequately to explain its criteria for determining undue discrimination and why the allocation it adopted was not unduly discriminatory. The panel voted to deny rehearing, but the court granted rehearing en banc to consider the issues raised by the dissent, and vacated the portions of the panel opinion concerning the specific allocation of costs. Mississippi Industries v. FERC, 259 U.S.App.D.C. 244, 814 F.2d 773 (1987). Later, the en banc court vacated its order granting rehearing. 262 U.S.App.D.C. 41, 822 F.2d 1103 (1987). At the same time, the panel vacated its order denying rehearing, granted rehearing, reversed FERC’s order, vacated the part of its opinion concerning specific cost allocations, and remanded to FERC for reconsideration of the decision to equalize capacity costs and for an explanation of what constitutes undue discrimination and why FERC’s order was not unduly discriminatory. Mississippi Industries v. FERC, 262 U.S.App.D.C. 42, 822 F.2d 1104 (1987). On remand, FERC has issued an opinion reaffirming and further explaining the basis for its previous allocation. See System Energy Resources, Inc., 41 FERC ¶ 61,238 (1987).

9. The court pointed out that approval to build Grand Gulf in the State of Mississippi had been secured on the strength of certain assumptions:

the first unit was to be operational in 1980, the two units were to cost $1.227 billion, and Mississippi ratepayers were not to pay for any more of its capacity than they needed.

506 So.2d at 984. Reliance on these assumptions proved unjustified:

Unit 1 began operation in July, 1985; the cost of Unit 1 alone was over $3.5 billion; and the MSU-controlled operating companies agreed among themselves that Mississippians should pay for 1/3 of its cost.

Ibid. (emphasis omitted). Of course, the failure of the assumptions made by both MP&L and the State at the time construction of Grand Gulf was approved has little to do with the preemption question before us. We note, however, that the failure was not the result of any deception on the part of MP&L, MSU, or MSE. At the time construction of Grand Gulf was initiated, no one anticipated the enormous cost overruns that would be associated not only with that plant but also with virtually every nuclear power facility being constructed in the United States. See nn. 2 and 5, supra.

10. Appellant asserted in its jurisdictional statement that the Mississippi Supreme Court had rejected its challenge to the constitutionality of Miss.Code Ann. § 77-3-39 (Supp.1987), and that this Court had appellate jurisdiction under 28 U.S.C. § 1257(2). Relying on this assertion and on the substantial federal question presented, we postponed further consideration of the question of jurisdiction to the hearing of the case on the merits. 484 U.S. 813 (1987). On further review of the decision of the Mississippi Supreme Court and of the briefs submitted by appellant to that court, however, we are of the view that appellant never challenged the constitutionality of § 77-3-39; rather, it merely argued that the MPSC’s exercise of jurisdiction to determine prudence would violate the Supremacy Clause. Although appellant’s argument implicitly called into question the scope of any state statutes that speak to the MPSC’s jurisdiction, it was not the type of express challenge to the constitutionality of the state statute required for this Court’s exercise of jurisdiction under § 1257(2). See Peralta v. Heights Medical Center, Inc., 485 U.S. 80, 84, n. 4 (1988). Consequently, we dismiss the appeal for want of jurisdiction. However, because the papers do present a substantial federal question,"construing the papers filed as a petition for a writ of certiorari, we now grant the petition." Addington v. Texas, 441 U.S. 418, 422-423 (1979); see 28 U.S.C. § 2103. As we have in previous cases in which we have construed a jurisdictional statement as a petition for certiorari, for convenience, we continue to refer to the parties as appellant and appellees. See Peralta, 485 U.S. at 84, n. 4; Kulko v. California Superior Court, 436 U.S. 84, 90, n. 4 (1978).

11. Appellees contend that the judgment of the Mississippi Supreme Court is not "final" within the meaning of 28 U.S.C. § 1257 because further proceedings will be held on remand. The critical federal question -- whether federal law preempts such proceedings while the FERC order remains in effect -- has, however, already been answered by the State Supreme Court, and its judgment is therefore ripe for review. See Cox Broadcasting Corp. v. Cohn, 420 U.S. 469, 477 (1975). See also R. Stern, E. Gressman, & S. Shapiro, Supreme Court Practice 129 (6th ed., 1986).

12. It is clear that the only purpose of the prudence review ordered by the Mississippi Supreme Court was to determine whether the costs FERC had directed MP&L to pay for its allocation of Grand Gulf power should be "trapped" or passed on to MP&L’s retail customers. The Mississippi Supreme Court’s judgment ordering the review itself had the effect of "trapping" some Grand Gulf costs, since the MPSC responded to the judgment by rescinding the previously approved rate increase and ordering MP&L to submit a plan for refunding to its customers all of its prior recovery of Grand Gulf expenses. To prevent this trapping, we granted a stay of the Mississippi Supreme Court’s judgment. Mississippi Power & Light Co. v. Mississippi ex rel. Pittman, 483 U.S. 1013 (1987).

13. Appellant and other parties unsuccessfully challenged the jurisdiction of FERC over the UPSA in the FERC proceedings, and on appeal to the United States Court of Appeals for the District of Columbia Circuit. After thorough consideration at every level of administrative and judicial review, this challenge was rejected. See 26 FERC, at 65, 113-65, 117; 31 FERC, at 61,643-61,644; 32 FERC, at 61,943-61,951; 257 U.S.App.D.C. at 258-262, 808 F.2d 1539-1543.

14. In addition to arguing that the Supremacy Clause does not bar an MPSC prudence inquiry, appellees argue that MP&L should be equitably estopped from arguing that the prudence review ordered by the Mississippi Supreme Court is preempted by federal law. In acquiring a license from the State of Mississippi to construct Grand Gulf, MSU and MP&L made certain representations to the MPSC as to how Grand Gulf costs and power would be allocated. Appellees do not claim that these representations were false when made, Brief for Appellee State of Mississippi 39, or that FERC was bound by the representations made in the state proceedings, id. at 42; rather, they argue that MSU should have been

denied standing . . . to file an application with FERC, or enforce any allocation against the Mississippi service area other than originally represented to secure the necessary construction certificate,

id. at 43. This argument has no relevance to the preemption question before us. Representations in state proceedings, even ones that were false when made, cannot subvert the operation of the Supremacy Clause. The appropriate place to contend that MSU and or MP&L lacked standing before the FERC was in the Commission proceedings, and the argument was in fact raised and rejected in those proceedings. See 257 U.S.App.D.C. at 268-269, 808 F.2d at 1549-1550.

Contents:

Related Resources

None available for this document.

Download Options


Title: Miss. P. & L. Co. v. Miss. Ex Rel. Moore, 487 U.S. 354 (1988)

Select an option:

*Note: A download may not start for up to 60 seconds.

Email Options


Title: Miss. P. & L. Co. v. Miss. Ex Rel. Moore, 487 U.S. 354 (1988)

Select an option:

Email addres:

*Note: It may take up to 60 seconds for for the email to be generated.

Chicago: John Paul Stevens, "Stevens, J., Lead Opinion," Miss. P. & L. Co. v. Miss. Ex Rel. Moore, 487 U.S. 354 (1988) in 487 U.S. 354 487 U.S. 358–487 U.S. 376. Original Sources, accessed March 28, 2024, http://www.originalsources.com/Document.aspx?DocID=D31ZW5J7E76LGLD.

MLA: Stevens, John Paul. "Stevens, J., Lead Opinion." Miss. P. & L. Co. v. Miss. Ex Rel. Moore, 487 U.S. 354 (1988), in 487 U.S. 354, pp. 487 U.S. 358–487 U.S. 376. Original Sources. 28 Mar. 2024. http://www.originalsources.com/Document.aspx?DocID=D31ZW5J7E76LGLD.

Harvard: Stevens, JP, 'Stevens, J., Lead Opinion' in Miss. P. & L. Co. v. Miss. Ex Rel. Moore, 487 U.S. 354 (1988). cited in 1988, 487 U.S. 354, pp.487 U.S. 358–487 U.S. 376. Original Sources, retrieved 28 March 2024, from http://www.originalsources.com/Document.aspx?DocID=D31ZW5J7E76LGLD.